[1]
NST, D.P. 2020. Penerapan Metode Critical Path Method (CPM) Pada Network Planning Dalam Efisiensi Waktu dan Biaya Proyek Pembangunan Rumah Minimalis (Studi Kasus: Property Group Medan). JURNAL RISET KOMPUTER (JURIKOM). 7, 4 (Aug. 2020), 492–498. DOI:https://doi.org/10.30865/jurikom.v7i4.2266.