Analisis Network Planning dengan Critical Path Method (CPM) Dalam Rangka Efisiensi Waktu dan Biaya Proyek Pembangunan Rumah Minimalis (Studi Kasus: Property Group Medan)

Authors

  • Lilyana Lilyana Universitas Budi Darma, Medan

DOI:

https://doi.org/10.30865/json.v2i1.2459

Keywords:

Schedule, Activities, Critical Pathways, Cost, CPM

Abstract

The development of science and technology in the field of computers is currently so fast, along with many new discoveries that are useful in developing this technology. This greatly affects the performance of each agency and company in dealing with any problems that arise in data processing. Analysis of the application of time management in home construction construction projects, using the Microsoft Project 2007 application, is very helpful for contractors in managing home construction projects, starting from making project plans, allocating resources, planning construction project costs, making project movement plans and evaluating projects. in accordance with the provisions for completing the study in the Information Systems undergraduate program which must make a thesis.

Author Biography

Lilyana Lilyana, Universitas Budi Darma, Medan

Program Studi Teknik Informatika

References

Nurhayati, “Manajemen Proyekâ€, Graha Ilmu, Yogyakarta, 2010

Kusrianto Adi, “Panduan Lengkap memakai Microsoft office projectâ€, PT Elex Media Komputindo, Jakarta, 2012

Abrar Husen, “Manajemen Proyek Network Planningâ€, Graha Ilmu, Yogyakarta, 2010

Sugianto Mikael, “Pengelolaan Proyek Kontruksi dengan Microsoft Project 2010†CV. Andi Offset, 2012

Ervianto Wulfram, “Teori Aplikasi Manajemen proyek Kontruksiâ€, CV. Andi Offset, Yogyakarta, Edisi 1, 2005

http://www. Perhitungan waktu Pert.com, diakses pada 21 Mei 2014

http://www. Metode pert jalur kritis.com diakses pada 21 Mei 2014

http://www. Metode Cpm waktu kritis, diakses pada 21 Mei 2014

http//www. elib.unikom.ac.id, diakses pada 21 Mei 2014

Downloads

Published

2020-09-30

How to Cite

Lilyana, L. (2020). Analisis Network Planning dengan Critical Path Method (CPM) Dalam Rangka Efisiensi Waktu dan Biaya Proyek Pembangunan Rumah Minimalis (Studi Kasus: Property Group Medan). Jurnal Sistem Komputer Dan Informatika (JSON), 2(1), 80–89. https://doi.org/10.30865/json.v2i1.2459